Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the all-in-one-seo-pack domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/sftpuser/alteia.agencejill.com/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-migrate-db domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/sftpuser/alteia.agencejill.com/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/sftpuser/alteia.agencejill.com/wp-includes/functions.php on line 6114

Case Study

ENEDIS

Project overview

ENEDIS

  • Serves 36 million customers with only 38,507 employees.
  • Develops, operates, modernizes, and maintains 1.4 million kilometers of low and medium voltage and medium-voltage electricity network (220 and 20,000 volts) and manages the associated data.
The largest production deployment of visual intelligence applications.
Enedis is the public electricity distribution network operator for 95% of the French territory and the largest in Europe. Beginning in 2020, Enedis has decided to deploy artificial intelligence across its organization by leveraging the Alteia AI platform. This partnership allows Enedis to accelerate its digital transformation with the systemic use of visual data and AI to verify operations of its medium voltage overhead network. Deployed on 10,000 kilometers of lines in the first year alone, this move towards AI at scale is a world first in the electrical network management sector.

Results

40%

savings on inspection costs

30%

savings on downtime (cost of downtime = 1MEUR/h/section)

Alteia Platform

Project highlights

  • Centralize all heterogeneous data on a physical asset (BIM / CAD models, IoT, Lidar, images, etc.) onto the cloud.
  • Access data from anywhere, at all levels of the company.
  • Detect defects, hazards, and maintenance needs with a 90 +% accuracy with automated visual inspection leveraging our pre-built ML models.
  • Standardize, control, and optimize asset inspections. Do so with long and short-term scheduling and adaptation to the local field requirements, such as various collection methodologies (helicopter, UAV, or a dedicated mobile application).
  • Decrease operational costs continuously with an iterative improvement cycle based on AI asset default detection and reporting.
  • Assess risk in real-time for better planning with optimized work orders pushed directly into management systems.
  • Evaluate asset health and related maintenance costs with asset tracking for defective assets by type and location.
GE3 (1)
Screen-Shot-2021-07-07-at-15.58.31-856x570 (1)